Blog

Offshore Terminal Optimization

Measure Success and Predict Failure with Terminal Integrity Management

To ensure that your offshore terminal operates efficiently throughout its service lifespan, you need operational integrity management that is unique to your terminal, your team and your environment – while remaining consistent with applicable standards. This plan should include measurement and analysis that quantifies progress, optimisation and operational expenditure (OpEx) so that you can understand and predict successes and failures. Here’s where to start!

Read More »
SPM Hose Maintenance

Case study: Submarine and Floating Hose Change out

The high-level overview of a total hose changeout project, including OCIMF hose testing of subsea and floating hoses. Find out how long the hose changeout project normally takes, what the risks are and how to mitigate them. Reduce risks, save time and money with a streamlined hose change out.

Read More »
OCIMF Hose Testing

Project Report: OCIMF testing and Hose change out – what you see is not what you get.

Hose manufacturers typically recommend SPM hose change out after 5 years but it may also be needed at other times due to hose failure or excessive wear. Replaced hoses should undergo OCIMF testing to determine wear patterns and root causes of failure, which will assist in ensuring that the shortened lifespan is not repeated in the new hoses. Knowing what to expect from your hose change out and the OCIMF testing process will ensure that you get it right.

Read More »